• News
  • Financial
  • Passenger
    • High-speed
    • Commuter Rail
    • Main line
    • Metros
    • Light Rail
  • Freight
  • Fleet
  • Infrastructure
  • Policy
  • Technology
  • Regions
    • North America
    • Central/South America
    • Europe
    • Africa
    • Middle East
    • Asia
    • Australia/NZ
  • Subscribe
  • Register
  • Subscribe
  • Login
  • FAQs
Newsletter

Menu
  • News
  • Financial
  • Passenger
    • High-speed
    • Commuter Rail
    • Main line
    • Metros
    • Light Rail
  • Freight
  • Fleet
  • Infrastructure
  • Policy
  • Technology
  • Regions
    • North America
    • Central/South America
    • Europe
    • Africa
    • Middle East
    • Asia
    • Australia/NZ
  • Subscribe
close

Australia/NZ

April 12, 2013
Written by Mark Carter

Latest News

Australia’s HSRA announces project partners

July 27, 2026 | Australia/NZ

Germany limits DB’s access on key routes opening the door to Italo

July 20, 2026 | Main line

Omio Group to acquire Rail Europe

July 20, 2026 | Financial

France signs rolling stock action plan

July 17, 2026 | Policy

Austin awards Stadler LRV contract

July 17, 2026 | Fleet

Australian high-speed study published

THE Australian government has released its long-awaited Stage 2 study into options for a future high-speed rail link between the major cities on the country's east coast.

The study estimates the cost of building a 1748km line linking Brisbane, Sydney, Canberra and Melbourne at $A 114bn ($US 120bn), with an expectation that the government would be required to fund most of the upfront capital cost.

It would be built as an electrified, standard-gauge, double-track line with a maximum operating speed of 350km/h. A contributing factor to the significant projected cost is the need for approximately 144km of tunnels, nearly half of which would be under Sydney and surrounding districts.

Federal transport minister Mr Anthony Albanese says the report is more than just a feasibility study. "This work has detailed designs, right down to the stations with estimates on costs and benefits, construction schedules, patronage predictions, environmental implications and, importantly, a proposed optimum route," he says.

The study envisages that construction of the first stage between Sydney and Canberra would not commence until 2027 and operations would begin in 2035, giving a travel time of 1h 4min for the 280km journey. An extension to Melbourne would open five years later with a journey time of 2hr 44min for the 844km Sydney – Melbourne journey. A full east coast route linking Brisbane and Melbourne would not be completed until 2058.

The study concludes that once fully operational, up to 84 million passengers would be carried each year.

While no funding commitment has yet been made, Albanese has indicated he will initiate a comprehensive programme of public consultation and debate on the role high-speed rail could play in Australia's transport future.

"My department's HSR Unit is also embarking on detailed consultations with industry, local governments and community groups," he says. "I am also establishing a high level HSR Advisory Group to work along with the HSR Unit in directly advising the government on key industry and community issues arising out of the report."

The minister has indicated he will also be writing to the state premiers of Queensland, New South Wales and Victoria, as well as the Australian Capital Territory chief minister, seeking their formal views on the report and assistance in safeguarding land along the proposed route.

THE Australian government has released its long-awaited Stage 2 study into options for a future high-speed rail link between the major cities on the country's east coast.

The study estimates the cost of building a 1748km line linking Brisbane, Sydney, Canberra and Melbourne at $A 114bn ($US 120bn), with an expectation that the government would be required to fund most of the upfront capital cost.

It would be built as an electrified, standard-gauge, double-track line with a maximum operating speed of 350km/h. A contributing factor to the significant projected cost is the need for approximately 144km of tunnels, nearly half of which would be under Sydney and surrounding districts.

Federal transport minister Mr Anthony Albanese says the report is more than just a feasibility study. "This work has detailed designs, right down to the stations with estimates on costs and benefits, construction schedules, patronage predictions, environmental implications and, importantly, a proposed optimum route," he says.

The study envisages that construction of the first stage between Sydney and Canberra would not commence until 2027 and operations would begin in 2035, giving a travel time of 1h 4min for the 280km journey. An extension to Melbourne would open five years later with a journey time of 2hr 44min for the 844km Sydney – Melbourne journey. A full east coast route linking Brisbane and Melbourne would not be completed until 2058.

The study concludes that once fully operational, up to 84 million passengers would be carried each year.

While no funding commitment has yet been made, Albanese has indicated he will initiate a comprehensive programme of public consultation and debate on the role high-speed rail could play in Australia's transport future.

"My department's HSR Unit is also embarking on detailed consultations with industry, local governments and community groups," he says. "I am also establishing a high level HSR Advisory Group to work along with the HSR Unit in directly advising the government on key industry and community issues arising out of the report."

The minister has indicated he will also be writing to the state premiers of Queensland, New South Wales and Victoria, as well as the Australian Capital Territory chief minister, seeking their formal views on the report and assistance in safeguarding land along the proposed route.



Categories: Australia/NZ, News
Tags: 1 Highspeed, Australia

Popular Stories

No recent posts.

Resources

  • Digital Edition
  • Advertising
  • Podcasts
  • Webinars & White Papers
  • Industry Events
  • About Us
  • Contact Us
  • Tenders/Employment
Rail market intelligence to unlock your business potential.
Sign up for the IRJ Rail Brief Newsletter
  • Subscribe/Renew to get all access now!
    Subscribe Today

    Sign up for the

    Rail Brief Newsletter....

    Get the latest news!

    Sections

    • News
    • Passenger
    • Financial
    • Freight
    • Fleet
    • Infrastructure
    • Policy
    • Technology
    • Regions
    • Innovations

    Connect with us

    • Subscribe
    • Circulation
    • Newsletters
    • Digital Edition

    About us

    • Subscribe
    • Advertise
    • Contact Us
    • Privacy Policy
    • Terms & Conditions
    • Cookie Policy

    Resources

    • Railway Age
    • Railway Track & Structures
    • Simmons-Boardman Books
    • The Railway Educational Bureau
    © Copyright Simmons-Boardman Publishing, Inc. 2026
    searchcloselinkedin-squaretwitterfacebookbarscaret-downenvelopeellipsis-v
    Manage Consent

    To provide the best experience, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.

    Functional Always active
    The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
    • Manage options
    • Manage services
    • Manage {vendor_count} vendors
    • Read more about these purposes
    View preferences
    • {title}
    • {title}
    • {title}