A legal challenge is brewing after BBT SE, the company overseeing the 64km Brenner Base Tunnel project between Austria and Italy, cancelled a €966m contract with the ARGE H51 Pfons-Brenner consortium, which is responsible for the 18km lot H51 Pfons-Brenner section of the tunnel.
Legal challenge looms after €966m Brenner Base Tunnel contract cancelled
A legal challenge is brewing after BBT SE, the company overseeing the 64km Brenner Base Tunnel project between Austria and Italy, cancelled a €966m contract with the ARGE H51 Pfons-Brenner consortium, which is responsible for the 18km lot H51 Pfons-Brenner section of the tunnel.
Photo Credit: BBT SE
Categories: Europe, High-speed, Infrastructure, News