Load deflection tests are needed on all non-standard bridges, says former Indian Railways chief engineer.
Further delay for new line to Kashmir
Load deflection tests are needed on all non-standard bridges, says former Indian Railways chief engineer.
Major structures include word's highest arch railway bridge, 359m above the bed of the River Chenab.
Categories: Asia, Infrastructure, Main line, News