The first of two 27.3km bores was completed on September 11.
First bore of Semmering Base Tunnel complete
The first of two 27.3km bores was completed on September 11.
Photo Credit: ÖBB /Ebener
Categories: Europe, Freight, Infrastructure, Passenger
Tags: Austria, Premium, Semmering Base Tunnel