IRJ editor-in-chief, Kevin Smith, considers the implications for the Trans-European Transport Network (TEN-T), in light of the fact that the 2030 target will not be achieved.
Auditors expose Europe’s rail project failings
IRJ editor-in-chief, Kevin Smith, considers the implications for the Trans-European Transport Network (TEN-T), in light of the fact that the 2030 target will not be achieved.
EU TEN-T funding was provided to build the Pajares Base Tunnel in Asturias.
Photo Credit: Ministry of Transport and Sustainable Mobility
Categories: Europe, Kevin Smith
Tags: EU, Europe, European Union, infrastructure, Premium, TEN-T