The 44-strong ICN fleet is being refurbished at a cost of $US 577.4m.
SBB unveils first refurbished ICN train
The 44-strong ICN fleet is being refurbished at a cost of $US 577.4m.
Photo Credit: SBB
The 44-strong ICN fleet is being refurbished at a cost of $US 577.4m.